SLT Replication - Status Scheduled

$
0
0

Hi All,

 

I am facing an issue while replicating tables from an ECC(source system) into HANA server(target system).

 

I have a working SLT replication server which is hosted on a different system than the source system.

 

The replication status is showing 'Scheduled' for the last 48 hours.

 