Hi Guys,
I have some queries about Hana Installation and Migration,
1. How much time is required for installing SAP HANA (How much time is required)?
2. Hana Migration (From Oracle DB to Hana DB (How much time is required)) ?
For migration we have below existing landscape is there,
Operating System : Linux
Database & Size : Oracle DB and 2TB DB size
SAP Landscape : ECC6 , BO,BW,SD,MM,PP.
Third party integrated Applications : like SSRS,AX,etc..
Now we are planning to migrate from Oracle DB to HANA DB.Please let me know how much time(Estimation Time) required for above system landscape including Dev,QA and Prod ?
Thanks,
Rameessh