Hi Experts,
In our current project due to time crunch, we are planning to connect HANA-DEV box to ECC-SANDBOX, with ECC-SANDBOX having all the data of ECC PROD, as the ECC DEV is not ready due to EHP upgrade.
My question is: If we are connecting HANA DEV to ECC Sandbox(With Same data as PROD) and then later connecting the same HANA DEV to ECC DEV(More or Less Data as Compared to PROD), then:
1. Is this practically possible, at all ?
2. If yes, what are the technical configurations /challenges which we should take into consideration ?
Looking forward to your fast response.
Many Thanks,
Regards,
Jatinder