We are doing HANA (Proof of Concept). We converted BW system from 7.3 sp pka 11 to to 7.31 SP 13 with HANA .
But now when loading a DTP with parallel processes to 12 , it is only doing 3 packets at a time.
Did anybody experienced this?
We are doing HANA (Proof of Concept). We converted BW system from 7.3 sp pka 11 to to 7.31 SP 13 with HANA .
But now when loading a DTP with parallel processes to 12 , it is only doing 3 packets at a time.
Did anybody experienced this?