Hello Colleagues,
I am trying to do the following.
1. I have 2 schemas A and B in a system.
2. I need to copy all the contents of A into B.
3. I have exported both A and B. B as a backup.
4. Can i import A into B using replace option?? Will this cause harm to the data already available at B??
Thanks and Regards,
Akhil