Hi gurus,
I have installed COPA Acelerator with HANA. I have set KEHC and DBCO for the secondary database connection. Test connection is succesful between R3 and HANA. Replication is too succesful.
Everything is correct in KEHC, and we have created column views in HANA. But we dont have information about time stamp and last update in HANA System.
Besides, when we try to execute ke24, we are getting an error connection
and we get this error in sm21
Thank you very much,