Hi Experts,
For Migration of BW 7.3 SP7 to HANA Data Base , I would like to know procurement details for HANA data base.
suppose current Database used by BW in production is 468GB (51%), assuming for HANA database (ROW and column store) it may require say 350GB space.
In that case , how many CPUs will be required??
as per details i believe , production system can be only on 1 HANA DB, and for Dev. and Quality we may require separate HANA BOX.
Also, w.r.t. Master and slave, at least 2 BOX are necessary (since scale out option is possible).
So does that mean , total 4 BOX are required?? or 2 HANA BOX are enough, may be of T-shirt size 'M' 4 CPU sockets.
Please correct me if this is not the case..
Thanks and Regards,