Hi Folks
Could someone share the opinions /ideas on the following scenarios in a typical existing landscape how best we can accommodate HANA
I have existing landscape where i have ECC 6.0 ,BW 7.3 running on DB2 as DB.
I have a new HANA SP7.0 box along with BO 4.0 FP03 .
Now if i would like to enhance the following scenario what will be the possible approaches
- I have to give an extra field in the BO report which is taking the data from BW infocube and loading the data from ECC 0FI_GL_14 .
- I donot want to modify or disturb the existing flow and i wanted to report extra field which is available from ECC BKPF table.
How exactly we can approach in the following two cases.
Assume that
case 1 : my ECC and BW are attached to HANA system with DB2 .
Case 2: my ECC and BW are running on HDB and attached to HANA system .
Thanks in Advance for your help..!
Regards
K M R
!...tcaf eht syawla ton si rorrim
mirror is not always the fact...!